12232022JA
U-00237
8
Wall Installation
Step 14:
Measure the overall length and height of the frame and drill holes for the top brackets. Line up the wall
brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver. If not
installing into a structural wood stud, use a hollow wall anchor then screw in the M5x50 wood screws with a
screwdriver. Make sure the brackets are leveled.
Diagonal Models above 150” require 6 x wall brackets
Step 15
: Position the fixed frame screen onto the bottom wall brackets (fig. 1), lift and secure on the top wall
bracket and push down at the center of the top of the (fig. 2) frame to secure.
Model/Size X = Wall bracket distance
X1 = Bracket hole distance
Y = Top/Bottom Wall Bracket Height
AR92H
1100mm (43.3”)
30mm (1.18”)
980mm (38.58”)
AR100H
1200mm (47.24”)
30mm (1.18”)
1080mm (42.52”)
AR110H
1300mm (51.18”)
30mm (1.18”)
1210mm (47.64”)
AR120H
1400mm (55.12”)
30mm (1.18”)
1330mm (52.36”)
AR135H
1500mm (59.06”)
30mm (1.18”)
1520mm (59.84”)
AR150H
1600mm (62.99”)
30mm (1.18”)
1710mm (67.32”)
AR125C
1200mm (62.99”)
30mm (1.18”)
1080mm (42.52”)
AR138C
1400mm (62.99”)
30mm (1.18”)
1210mm (47.64”)
Model/Size X = Wall bracket distance
X1 = Bracket hole distance
Y = Top/Bottom Wall Bracket Height
AR158C
900mm (35.43’’)
30mm (1.18”)
1410mm (55.51’’)
k.
j.
For Technical Support
or an Elite Screens
contact in your area,
visit
www.elitescreens.com
Don’t tighten the screw to allow
the screen to move up and down
Don’t tighten the screw to allow
the screen to move up and down
1.
2.