background image

12052022JA 

 

www.elitescreens.com 

 

 

1. Mark the location of where the screen is to be installed on the ceiling.

  

Note:

 

The bracket distance (L) should be less than the length of the screen. 

 
 
 

 
 
 
 
2. Drill the holes and insert the 

Anchors (E)

 and install the bracket into the wall with the 

M5.5 screws (D). 

  

Then loosen the screw under the 

Bracket (A)

 by turning it counterclockwise. 

 
 
 
 
 
 
 
 
 
 
 
 
3. Attach the screen to the 

Bracket (A)

 by inserting the top of the case to 

Fix Plate 1

 and securing the back of the 

case to 

Fix Plate 2

. Make sure the case slots are securely attached to the mounting brackets, then tighten the screws 

under the 

Bracket (A) 

to hold it in proper place.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

II.

 

Suspended 

1. You can also hang the screen on a ceiling by using chains (not included). 

Bracket 
Fix Plate 1 

 

Bracket 
Fix Plate 2 

 

Bracket 
Fix Plate 1 

Summary of Contents for Spectrum Tab-Tension 2 CineGrey 3D Series

Page 1: ...uide for future reference To avoid damaging the unit do not use with any accessories triggering sources not recommended or specified by the manufacturer Handle the unit carefully during transportation...

Page 2: ...r more of the following measures Reorient or relocate the receiving antenna of the device which may be causing the interference Increase the separation between the screen and the device s receiver Con...

Page 3: ...jector Ceiling Installation Make sure the projector light in is angled 1 to reflect 2 at the mirror opposite angle light out to align with the viewer s eye level Projector Tabletop Make sure the proje...

Page 4: ...Then loosen the screw under the Bracket A by turning it counterclockwise 3 Attach the screen to the Brackets A by inserting the top of the case to Fix Plate 1 and securing the back of the case to Fix...

Page 5: ...oosen the screw under the Bracket A by turning it counterclockwise 3 Attach the screen to the Bracket A by inserting the top of the case to Fix Plate 1 and securing the back of the case to Fix Plate 2...

Page 6: ...he case to Fix Plate 1 and securing the back of the case to Fix Plate 2 Make sure the case slots are securely attached to the mounting brackets then tighten the screws under the Bracket A to hold it i...

Page 7: ...e control Item A Fig 1 The Infrared functions by direct line of sight contact using a beam range of 30 feet Aim the IR remote at the circular window located on the left side of the screen 2 RF Remote...

Page 8: ...tor s power cycle Here s how to set up your Wireless 5 12 volt trigger Synchronization Instructions Step1 Connect one end of the 3 5 mm wireless 5 12 volt trigger cable to the RF remote Step 2 Connect...

Reviews: