STEP 9
STEP 10
Upper Second Hole
Last Third Hole
First Hole
SCREW MUST BE INSERTED
IN THE FIRST HOLE ON THE
DRAWER RUNNER
HARDWARE NEEDED:
C.
12PCS
L.
3PCS
A.
4PCS
H.
H.
2PCS
N.
2PCS
ARROW ON
LOCKING
NUT MUST
POINT
TOWARDS
HOLE IN
EDGE OF
PANEL
H
8
L
C
8
8
N
8
H
8
8
A
8
FRONT
BACK
2PCS
HARDWARE NEEDED:
A.
4PCS
H
7
ARROW ON LOCKING
NUT MUST POINT
TOWARDS HOLE IN
EDGE OF PANEL
A
7
H.
4PCS
7
7
CCO-SB136-WHT / PAGE 8
STEP 25
I
YOU SHOULD RE-ADJUST
SCREWS AS SHOWN TO
ALIGN DOOR ONCE HINGES
HAVE BEEN ATTACHED
15
17
14
10
9
6
F
17
P
O
1.
O
2.
O
3.
P
O
17
9
11
11
16
2. LATERAL
ADJUSTMENT BY
SCREW ADJUSTING
1. VERTICAL
ADJUSTMENT
VIA SLOT IN THE
MOUNTING PLATE
3. FRONT-TO-BACK
BY THE SLACKING
THE HINGE ARM
MOUNTING SCREW
HARDWARE NEEDED:
P.
4PCS
F.
1PC
I.
1PC
CCO-SB136-WHT / PAGE 17