background image

STEP 5

STEP 6

NB SB1247-OK / PAGE 6

6

6

A

H

C

K

HARDWARE NEEDED:

A.

C.

H.
K.

SCREW MUST BE INSERTED

IN THE FIRST HOLE ON THE
DRAWER RUNNER

Upper Second Hole

Last Third Hole

First Hole

SCREW MUST BE INSERTED

IN THE FIRST HOLE ON THE
DRAWER RUNNER

Upper Second Hole

Last Third Hole

First Hole

8

8

A

H

C

K

HARDWARE NEEDED:

A.

4PCS

C.

H.
K.

2PCS

8PCS

2PCS

ARROW ON LOCKING

NUT MUST POINT

TOWARDS HOLE IN

EDGE OF PANEL

ARROW ON LOCKING

NUT MUST POINT

TOWARDS HOLE IN

EDGE OF PANEL

4PCS

2PCS

8PCS

2PCS

Summary of Contents for NB SB1247-OK

Page 1: ...5 6 7 8 HARDWARE NEEDED F 6PCS STEP 9 STEP 10 NB SB1247 OK PAGE 8 6 7 8 5 3 2 1 2 4 HARDWARE NEEDED F 8PCS M 1PC M 1PC F M F M 8 5 3 5 1 ROUND EDGE FACING UP ...

Page 2: ...ON Dimensions Width 1200mm Depth 400mm Height 730mm Please Keep For Future Reference Only IMPORTANT PLEASE READ THESE INSTRUCTION CAREFULLY BEFORE STARTING ASSEMBLY NOBU SERIES NB SB1247 OK SIDEBOARD NB SB1247 OK PAGE 1 ...

Page 3: ...e required vii Put the soft map on the floor to protect the furniture before assembly COMPONENTS HARDWARE Please check you have all the fittings part or tools are listed in below FITTINGS TOOLS NO NO QTY QTY FITTINGS TOOLS A B C D E F G H I J K L DOWEL 6x30MM BOLT M7x60MM SCREW M4x38MM DRAWER RUNNER A L R ALLEN KEY CAM BOLT CAM NUT 66 Pcs 4 Pcs 8 Pcs 18 Sets 1 Pc DRAWER RUNNER B L R M6X50MM SCREW ...

Page 4: ...OTTOM PANEL 5 SIDE PANEL_L 1pc 6 SIDE PANEL_R 1pc 7 LEG SUPPORT_F B 2pcs 8 LEG SUPPORT_L R 2pcs 9 PILLAR LEG_L 2pcs 10 PILLAR LEG_R 2pcs 11 DRAWER BACK 4pcs 12 DRAWER SIDE_L 4pcs 13 DRAWER SIDE_R 4pcs 14 DRAWER FRONT 4pcs 15 DRAWER BASE 4pcs 1pc NB SB1247 OK PAGE 3 6 10 5 7 8 9 3 3 4 4 2 1 1 11 12 13 14 15 2 16 DR BS SUPPORT RAIL 4pcs 16 ...

Page 5: ...STEP 1 STEP 2 NB SB1247 OK PAGE 4 3 3 3 A 3 A HARDWARE NEEDED I 4PCS HARDWARE NEEDED A 14PCS 1 1 2 2 I ...

Page 6: ...STEP 3 STEP 4 NB SB1247 OK PAGE 5 4 4 3 3 4 4 1 1 2 2 3 2 B P N M HARDWARE NEEDED A 8PCS HARDWARE NEEDED B 4PCS M 1PC N 1PC P 4PCS 3 4 ...

Page 7: ...ond Hole Last Third Hole First Hole SCREW MUST BE INSERTED IN THE FIRST HOLE ON THE DRAWER RUNNER Upper Second Hole Last Third Hole First Hole 8 8 A H C K HARDWARE NEEDED A 4PCS C H K 2PCS 8PCS 2PCS ARROW ON LOCKING NUT MUST POINT TOWARDS HOLE IN EDGE OF PANEL ARROW ON LOCKING NUT MUST POINT TOWARDS HOLE IN EDGE OF PANEL 4PCS 2PCS 8PCS 2PCS ...

Page 8: ...PCS C H K 2PCS 14PCS 4PCS SCREW MUST BE INSERTED IN THE FIRST HOLE ON THE DRAWER RUNNER Upper Second Hole Last Third Hole First Hole ARROW ON LOCKING NUT MUST POINT TOWARDS HOLE IN EDGE OF PANEL Upper Second Hole Last Third Hole First Hole SCREW MUST BE INSERTED IN THE FIRST HOLE ON THE DRAWER RUNNER C K C K ...

Page 9: ...3 6 7 8 2 1 4 1 9 STEP 11 STEP 12 H NB SB1247 OK PAGE 9 6 7 8 5 1 2 3 4 2 10 10 6 H 9 ...

Page 10: ...STEP 13 STEP 14 DRAWER X 4 11 11 A NB SB1247 OK PAGE 10 HARDWARE NEEDED A 16PCS O HARDWARE NEEDED O 6SETS ...

Page 11: ...47 OK PAGE 11 HARDWARE NEEDED A 8PCS H DRAWER X 4 12 A HARDWARE NEEDED A 8PCS H 4PCS 4PCS 13 13 12 12 ARROW ON LOCKING NUT MUST POINT TOWARDS HOLE IN EDGE OF PANEL ARROW ON LOCKING NUT MUST POINT TOWARDS HOLE IN EDGE OF PANEL STEP 15 ...

Page 12: ...13 11 12 13 11 D STEP 17 STEP 18 DRAWER X 4 NB SB1247 OK PAGE 12 HARDWARE NEEDED D 8PCS DRAWER X 4 14 H HARDWARE NEEDED H 12PCS 14 FINISHED FRONT EDGE ...

Page 13: ...14 11 12 13 DRAWER X 4 H 15 13 11 C STEP 19 DRAWER X 4 NB SB1247 OK PAGE 13 STEP 20 HARDWARE NEEDED C 24PCS 13 15 11 13 14 ...

Page 14: ...15 15 11 13 13 11 J LAST THIRD HOLE THIRD HOLE L DRAWER X 4 HARDWARE NEEDED J 24PCS L 8PCS STEP 21 DRAWER X 4 NB SB1247 OK PAGE 14 STEP 22 H Q 16 16 16 15 11 13 HARDWARE NEEDED Q 8PCS H 4PCS ...

Page 15: ...E G HARDWARE NEEDED E 8PCS G 4PCS 14 14 STEP 23 STEP 24 NB SB1247 OK PAGE 15 ...

Page 16: ...STEP 25 NB SB1247 OK PAGE 16 ...

Reviews: