background image

97382C (Rev. C - 3/01)

ECH8-1E   ECH8-2E   ECH8-3E

Refrigeration Package

Installation / Care / Use Manual

LEGEND

A = 3/8" O.D. TUBE WATER OUTLET

B = 1/4" O.D. TUBE WATER INLET

C = TEMPERATURE ADJUSTMENT

D = ELECTRICAL

INSTALLATION

1. When mounting unit in an open area, to insure proper ventilation,

  maintain a 4" (102mm) clearance from cabinet louvers on each side

  of cooler . When mounting unit  in a cavity or behind a wall maintain

  minimum space of 4" (102mm) on each side, 4" (102mm) on the top

  and a depth of 12" (305mm).

2. Water inlet is 1/4" (6 mm) O.D. tube. Contractor to supply the

   connections as required.

3. Connecting lines to be of unplated copper, thoroughly flushed to

   remove all foreign matter before being connected to cooler. If

   flushing does not remove all particles, a water strainer should be

   installed in supply line. This cooler is manufactured in such a manner

   that it does not in any way cause taste, odor, color or sediment

   problems. If a taste, odor or sediment problem is prevalent, try

   installing our waste filter module, Part No. 73-15242-51-550, on the

   supply line.

4. Connect cooler to building supply line with a shut-off valve and

   install a union connection between the valve and cooler

5. Electrical: Make sure power supply is identical in voltage, cycle,

  and phase to that specified on cooler serial plate. Never wire

  compressor directly to the power supply.

6. This chiller has been designed for use with potable water 

ONLY.

START-UP

1. Open supply line valve.

2. Purge air from all water lines by operating bubbler valve of

   fountain to which cooler is connected. Steady stream assures all

   air is removed.

3. Rotate fan to insure proper clearance and free fan action.

4. Connect to electrical power.

TROUBLE SHOOTING & MAINTENANCE

Temperature Control:

 Factory set at 50°F (± 5°) under normal

    conditions. For colder water, adjust screw on item no. 12 in

    clockwise direction.

Ventilation:

 Cabinet louvers and condenser fins should be

    periodically cleaned with brush, air hose or vacuum cleaner.

    Excess dirt or poor ventilation can cause no cold water and

    compressor cycling on the compressor overload protector.

Lubrication: 

Motors are lifetime lubricated.

Actuation of Quick Connect Water Fittings: 

Cooler is provided

    with lead-free connectors which utilize an o-ring seal. To remove

    tubing from the fittings, relieve water pressure, push in on gray

    collar while pulling on the tubing. To insert tubing, push tube

    straight into fitting until it reaches a positive stop, approximately

    3/4”.

TUBE IS SECURED

IN POSITION

SIMPLY PUSH IN

TUBE TO ATTACH

PUSH IN COLLET

TO RELEASE TUBE

PUSHING TUBE IN BEFORE

PULLING IT OUT HELPS TO

RELEASE TUBE

OPERATION OF QUICK CONNECT FITTINGS

Reviews: