background image

97560C (REV. B - 4/00)

ELKAY MANUFACTURING COMPANY • 2222 CAMDEN COURT • OAK BROOK, IL 60523 • 630.574.8484

FOR PARTS, CONTACT YOUR LOCAL DISTRIBUTOR OR CALL 1.800.323.0620

ERW20-1B/2B

ITEM

NO.

PART  NO.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19*

20

21

22

23

24

100806740570

19037000

23088C

23100C

23101C

23104C

26706C

26707C

26708C

26709C

27597C

28108C

30235C

30768C

35880C

35882C

35895C

35977C

35986C

30233C

30234C

66226C

66563C

70772C

ITEMIZED PARTS LIST

DESCRIPTION

*INCLUDES RELAY & OVERLOAD.  IF UNDER

WARRANTY, REPLACE WITH SAME COMPRESSOR

USED IN ORIGINAL ASSEMBLY.

NOTE:  All correspondence pertaining to any of the

above water cooler or orders for repair parts MUST

include model number and serial number of cooler, name

and part number of replacement part.

Grommet

Clip

Bracket Conduit

Panel Insulation Box (Rear)

Panel End

Box Insulation (Front)

Terminal Box

Grille

Cover Terminal Box

Rear Panel

Cover Insulation Box

Base Ass'y

Terminal Cover

Solenoid Valve

Overload

Cold Control

Cold Control Freeze Protect

Capacitor

Compressor Service Pak

Overload Spring

Clip Compressor

Condenser

Evaporator

Drain Plug

23

11

6

4

9

16

17

14

10

13,15,20,

21

3

24

12

1,2

WIRING DIAGRAM

7

22

5

19

8

                                         

INSTALLATION

1. Potable water inlet and outlet are 3/8" (9 mm) O.D. tube located on

top of unit.  Water cooled condenser inlet and outlet are 3/8" (9 mm)

O.D. tube located on right front of unit.  Installer to provide air gap at

condenser water outlet to comply with local plumbing specifications.

Contractor to supply connections as required.

2. Connecting lines to be of copper, thoroughly flushed to remove all

foreign matter before being connected to cooler.  If flushing does

not remove all particles, a water strainer should be installed in supply

line.

3. Connect cooler to building supply line with a shut-off valve and install

a union connection between the valve and cooler.

4. Electrical: Make sure power supply is identical in voltage, cycle, and

phase to that specified on cooler serial plate.  Never wire compressor

directly to the power  supply

                                          

START-UP

1. Open supply line valve.

2. Purge air from all water lines by operating bubbler valve of fountain.

3. Connect to electrical power.

                        

TROUBLE SHOOTING & MAINTENANCE

Temperature Control: 

Factory set for 50° F water (+/- 5°) under normal

conditions.  For colder water, adjust screw on item no. 16 CW.

Ventilation: 

Cabinet louvers should be periodically cleaned with brush,

air hose or vacuum cleaner.  Excess dirt or poor ventilation can cause

no cold water and compressor cycling on the compressor overload

protector

Lubrication: 

Motors are lifetime lubricated.

18

ITEM

NO.

PART  NO.

ERW20-2B - 220/240V, 50 HZ

DESCRIPTION

13

14

15

18

18A

19*

20

-

-

30560C

30781C

35997C

36000C

36003C

36002C

35998C

36001C

35999C

Terminal Cover

Solenoid Valve

Overload

Capacitor (run)

Capacitor (start)

Compressor Serv Pak

Overload Spring

Relay

Gasket

Reviews: