4
Plan View Layout / Conduit Position
Quick Start Instructions
1. Place operator in correct position (Pinion wheel to be parallel to the gate and stepped out
to allow for width of rack once it is mounted onto the gate frame). Mark out fixings and fix
operator to the concrete pad.
2. Fix rack to the gate frame keeping 1mm-2mm clearance between the rack teeth and Pinion
wheel.
3. Once the rack is fixed move the gate and sight the rack moving over the pinion wheel,
check that most of the pinion wheel meshes with the rack. Make sure rack runs freely over
the pinion wheel, any tights spots should be corrected by adjusting the rack height. Check
the operator is firmly bolted down to the concrete pad.
4. Ensure stops are installed on the gate for the fully closed and fully open positions.
5. Connect Photo Electric Beams, Safety Bump Strip and all other safety devices as
required.