iS400/iS400D/iS400Solar
SWING
GATE
OPENER
MANUAL
1.4 MAINTENANCE
:
Maintenance should be performed at least every six months. If it is used in high traffic area, a
more regular maintenance should be performed.
Disconnect the power supply
:
(1)
Clean and lubricate the screws, the pins and the hinge with grease.
(2)
Check the fastening points are properly tightened.
(3)
Check and make sure that the wire connections are in good condition.
Connect the power supply
:
(1) Check the power adjustments.
(2) Check the function of the manual release
(3) Check the photocells or other safety device.
Service History
Date
Maintenance
Installer
8