POLARIS 10●15●20●30●40●60●80●100●120●160
TRIPHASE-TRIPHASE
Rev. 04 – 06 December 2016
20
MBT
(Manual Battery Test)
FROM UPS TFT DISPLAY:
Enter in “9 - Setting-User display” select between the choices in the “Test Now” Menu.
OFF
= No Test
10s
= Test for 10s
10min
= Test for 10Min
EOD
= Test until End Of Discharge
WITH SOFTWARE MUSER4000:
After setting “Test Time” push Battery Test and immediately the Battery test start. The yellow Battery Led turn
on and buzzer “bip” 1 per sec. On the Muser monitor (show in red square) there is: Battery Supply indication.
When the test finish the battery Led turn off and the Inverter Green led turn on, the buzzer silence and in the
Muser monitor will be indicate Mains Supply.