Safety and operating instructions

Weather Stations P03/3-Modbus(-GPS)

 • Version: 07.06.2022 • Errors excepted. Subject to technical changes.

1.

Safety and operating instructions

Installation, testing, operational start-up and troubleshooting should 
only be performed by an authorised electrician.

CAUTION!
Live voltage! 

There are unprotected live components inside the device.

• Inspect the device for damage before installation. Only put undamaged 
devices into operation. 
• Comply with the locally applicable directives, regulations and provisions for 
electrical installation. 
• Immediately take the device or system out of service and secure it against 
unintentional switch-on if risk-free operation is no longer guaranteed.

Use the device exclusively for building automation and observe the operating instruc-
tions. Improper use, modifications to the device or failure to observe the operating in-
structions will invalidate any warranty or guarantee claims.
Operate the device only as a fixed-site installation, i.e. only in assembled condition and
after conclusion of all installation and operational start-up tasks, and only in the sur-
roundings designated for it.
Elsner Elektronik is not liable for any changes in norms and standards which may occur
after publication of these operating instructions.

For information on installation, maintenance, disposal, scope of 
delivery and technical data, please refer to the installation 
instructions.

2.

Description

The 

P03/3-Modbus and P03/3-Modbus-GPS Weather Stations

 measure temper-

ature, wind speed and brightness (eastern, southern and western sun) and recognize
precipitation.
The  

P03/3-Modbus-GPS 

additionally receives the UTC signals (Universal Time Coor-

dinated) as well as the site coordinates via an integrated GPS receiver. The direction of
the sun (azimuth) as well as its height (elevation) are calculated and indicated, too.

The devices are Modbus slaves with a RS485 interface and a RTU protocol. The Mod-
bus master, such as PC, SPS or MC can read the 

P03/3-Modbus(-GPS) Weather Sta-

tions

 measurement values with “Function 04h (Read Input Register)”.

Functions:

Brightness measurement

 with three separate sensors for east, south and 

west. Recognition of twilight/dawn

Summary of Contents for 30146

Page 1: ...P03 3 Modbus GPS Weather Stations for Modbus Item numbers 30146 P03 3 Modbus 30147 P03 3 Modbus GPS Installation and Adjustment EN ...

Page 2: ......

Page 3: ... 06 2022 Errors excepted Subject to technical changes 1 Safety and operating instructions 3 2 Description 3 3 Commissioning 4 3 1 Bus load 4 3 2 Setting up bus communication 4 3 3 Notes on commissioning 5 4 Transfer protocol 5 4 1 P03 Modbus request string from the master 5 4 2 P03 Modbus output string to the master 6 ...

Page 4: ...s available Clarification of signs used in this manual Safety advice Safety advice for working on electrical connections components etc DANGER indicates an immediately hazardous situation which will lead to death or severe injuries if it is not avoided WARNING indicates a potentially hazardous situation which may lead to death or severe injuries if it is not avoided CAUTION indicates a potentially...

Page 5: ...ion i e only in assembled condition and after conclusion of all installation and operational start up tasks and only in the sur roundings designated for it Elsner Elektronik is not liable for any changes in norms and standards which may occur after publication of these operating instructions For information on installation maintenance disposal scope of delivery and technical data please refer to t...

Page 6: ...sal Time Coordinated position degree of longitude and latitude and position of the sun azimuth elevation 3 Commissioning 3 1 Bus load The RS485 transceiver used has 1 8 of a standard RS485 bus load 1 8 unit load and can manage at least a 2 4 V at 54 Ohm bus load It can thus operate a bus with 32 nodes at standard bus load If nodes with a lower load than the standard bus load are connected to an RS...

Page 7: ...auds If one of these switches is set to ON the corresponding baud rate is applicable Parity If the two switches ODD and NONE are set to OFF the parity is EVEN Only ODD or NONE can switch the corresponding parity check Switch Mobu EE no function Switch Term bus termination 124 ohms 3 3 Notes on commissioning The correct wind value may only be supplied approximately 60 seconds after the sup ply volt...

Page 8: ...ensor west L 9 3 Sun sensor east H 1 99 Kilolux 10 Sun sensor east L 11 4 Light H 0 999 Lux 12 Light L 13 5 Wind H Value 10 gives wind speed in m s metres per second 14 Wind L 15 6 GPS RTC 1 GPS 0 quartz clock 50 ppm 16 Rain 1 rain 0 no rain 17 7 Day H 18 Day L Date Day 19 8 Month H 20 Month L Date Month 21 9 Year H 22 Year L Date Year 23 10 Hour H 24 Hour L Time Hour 25 11 Minute H 26 Minute L Ti...

Page 9: ...es Only available with version P03 3 Modbus GPS with GPS module Negative values are represented in the two s complement notation Time indicated as UTC Coordinated Universal Time 35 16 Degree of latitude H Value 100 xxx xx north south 36 Degree of latitude L 37 CRC L 38 CRC H Byte No Register address Variable Meaning ...

Page 10: ...e You can reach the technical service of Elsner Elektronik under Tel 49 0 70 33 30 945 250 or service elsner elektronik de We need the following information to process your service request Type of appliance model name or item number Description of the problem Serial number or software version Source of supply dealer installer who bought the device from Elsner Elektronik Questions about the product...

Reviews: