Chapter 5
Installation
●
meet either the specification for either ASTM B 88 (Type K or L) or ASTM B
280. In Canada installations, the tubing must additionally be marked and
plastic or rubber coated in accordance with CAN/CSA-B149.5-05.
●
Have no joints and can not be extended in any way
●
be protected by grommets or another method with similar protection when
traveling through bulkheads or portions of the trailer frame, be securely
clamped to the front wall of the trailer, and otherwise supported and secured
to minimize the effects of vibration
●
be installed in a protected location that is visible for inspection. It cannot be
installed inside the frame or any pipe or tubing.
●
not be installed inside the cargo area of the vehicle. It should not be closer
than 4 inches to any part of the exhaust system, run directly above any tire, or
within 6” of any tire.
●
Not be in contact with any electrical wiring
●
be connected so that slight shifting and the expansion or contraction that occur
with temperature do not cause stress on the fittings
7) Test the System for Leaks
The propane system must be tested for leaks before the operation of the heater is
tested or it is placed into operation. This leak test must use a pressure gauge or
manometer. If a leak is found, it must be located using a combustible gas
indicator, suitable leak detection solution, isolated testing and inspection of piping
segments, or a combination of these methods.
5.7 Final details
It is recommended that a X-850 ventilator be mounted in the front of the trailer for proper
ventilation and to ensure consistent ignition of the heater.
Give the installation one final check using the post-installation checklist to make sure
nothing has been forgotten or improperly completed. If everything looks good, the heater
is ready to be test fired. For instructions on firing up the heater for the first time please
consult the quick start guide. Once the heater has been test fired, the low pressure
regulator should be set to deliver 10.5” to 11” W.C. pressure to the heater while it is
running.
The installation is now complete and the heater can be placed in service.
22