25/02/2020
PIV LOFT IOM
Issue:
Saved Date:
A
25/02/2020
PIV LOFT IOM
Issue:
Saved Date:
A
JOIST MOUNTING
Suitable screws can be used to secure the unit, through the pre-punched holes in the base to wooden joists. Please ensure that there is at least
150mm clear all around the unit, including the bottom, to allow air to enter the unit via the filters. Please pay particular attention to make sure no
mineral wool or other loft insulation material is within 150mm of any part of the unit. Timber spacers on joists may be required to achieve this.
ELECTRICAL WIRING
The unit must be earthed.
The SANO IPIV Loft power cable has been prewired to aid installation. We recommend power cable termination to a suitable non-switched fused
spur. If using additional control cables these should be passed through the spare cable grommet.
FACTORY FITTED CABLE
25/02/2020
PIV LOFT IOM
Issue:
Saved Date:
A
Pre wired AC mains
cable
Brown - Live
Blue - Neutral
Green / Yellow - Earth
(Optional by installer)
(Optional by installer)
Fig.1 Control box
Fig.1 Control box
SANO IPIV BOARD SCHEMATIC
MCC OFF
HEATER OFF
PURGE
L
N
M
M
L
N
HEATER
RPM
+10
SPD
GND
THEAT
TSS
THR
BOOST
RATE
ECO-LoFlo
DISABLE
SWITCH
PURGE
SWITCH
(Optional by installer)
(Optional by installer)