26
Terminal Rack Installation
To install the terminal to a rack:
Step 1.
Attach the terminal to the vertical guides of the rack.
Step 2.
Align mounting holes in the support bracket with the corresponding holes in the rack guides. Use
the holes of the same level on both sides of the guides to ensure the terminal horizontal installation.
Step 3.
Use a screwdriver to screw the terminal to the rack.
The terminal is horizontally ventilated. The side panels have air vents. Do not block the air vents to avoid
components overheating and subsequent terminal malfunction.
To avoid overheating and provide necessary ventilation of the terminal, sufficient
space should be provided above and below the terminal, not less than 10 cm.
Fig. 7.2 – Terminal Rack Installation
Summary of Contents for LTP-4X
Page 11: ...11 Part I General ...
Page 29: ...29 Part II Getting Started with the Terminal ...
Page 37: ...37 Part III Configuring the Terminal ...
Page 98: ...98 Part IV ONT Configuration ...
Page 174: ...174 Part V Terminal Monitoring ...
Page 189: ...189 Part VI Terminal Maintenance ...
Page 191: ...191 Step 2 Remove the module from the slot Fig 43 4 Removing SFP Transceivers ...