14
BA-en-2087-2207_Static Combi Cleaner SCC-P
It is intended that the apron (3) be shortened to dimension (C) by the cus-
tomer and a contour be cut if necessary. The 1 mm thick conductive poly-
carbonate film should be worked on with a suitable cutting tool. From an
apron length (C) of less than 60 mm, the lower wire clamp is no longer
necessary..
3.4 Connecting the high voltage cable to the ion blower nozzle
The high voltage cable is fixed permanently to the ion blower nozzle.
3.5 Connecting the high voltage cable to the power supplies of
series ES5x, ES6x and PI
Warning!
Connect or disconnect the high voltage cables only with the power supply
switched off!
Connect the ion blower nozzles to the power supply using the prefabrica-
ted high voltage cable. Push the high voltage cables into the sockets up to
the stop. Then secure the cable in the socket with the clip provided (see
Fig. 5).
Warning!
In applications involving moving ion blower nozzles, the high voltage cable
must be attached such that there is no cable movement near the connec-
tion zone of the ion blower nozzles and the power supply unit. Use sui-
table clamps to attach the high voltage cables.
3.6 Connecting to ground
In units equipped with existing ground cables, the cables must be perma-
nently connected to ground potential. The ground cable should have a
minimum cross section of 1.5 mm
2
.
Fig. 5:
Connecting the
high voltage cable
Z001
78
y
Summary of Contents for SCC-P
Page 1: ...Operating Instructions Static Combi Cleaner SCC P BA en 2087 2207 Z 118074y_1 ...
Page 2: ...2 BA en 2087 2207_Static Combi Cleaner SCC P ...
Page 4: ...4 BA en 2087 2207_Static Combi Cleaner SCC P ...
Page 21: ...BA en 2087 2207_Static Combi Cleaner SCC_P 21 8 Dimensions Fig 6 Dimensions Z 11805y_3 ...
Page 22: ...22 BA en 2087 2207_Static Combi Cleaner SCC P ...
Page 23: ......