31
12 Index
A
Adjustment of the chain motor belt 10
Arm installation 12
B
Bottom view 8
C
Chain tension adjustment 8
Connecting plastic tubes 7
Continuous operation 29
D
Disconnecting plastic tubes 7
E
Electrical connection 15
Electronical connections 15
Error messages 30
F
Finger adjustment 11
G
General information 6
H
Horizontal Laser 22
L
Loader 130-crucibles version 6
Loader signal and control cable 16
M
Magnetic switch 24
Mechanical connection 1 13
Mechanical connection 2 13, 14
Mechanical connection to the analyser 13
P
Pneumatic connection 17
Pneumatic connections 17
S
Single step operation 19
Single step operation, button 18
Space requirements 6
Step by step 18
V
Vertical Laser 21
Summary of Contents for CHS-580A
Page 3: ...3 ...
Page 5: ...5 ...
Page 24: ...Step by step 24 Fig 20 Panel to remove Fig 21 Magnetic switch ...
Page 32: ... Eltra GmbH 42781 Haan Retsch Allee 1 5 Germany 09 12 2015 0000 ...
Page 33: ......
Page 34: ......