Installation

Function

Operation

Service

Operating instructions

ELYSATOR® Typ 50c - 100c

Summary of Contents for 100c

Page 1: ...www elysator com Installation Function Operation Service Operating instructions ELYSATOR Typ 50c 100c...

Page 2: ......

Page 3: ...onnection 8 6 Commissioning 6 1 Filling venting 9 6 2 Setting the throughput 9 7 Operation 7 1 System water 10 7 2 Checking the condition of the anodes 10 8 Maintenance 8 1 Interpreting the indicator...

Page 4: ...4 1 Safety instructions Not drinking water Maximum 100 C Maximum 10 bar pressure 10 bar...

Page 5: ...functions are combined into one appliance pH regulation by means of a sacrificial anode Micro gas bubble separator Magnetic flow filter 3 Standard delivery 2 plug 1 red brass 2 twin connector 1 3 4 r...

Page 6: ...th insulation 2 Indicator 3 Drain valve 4 Vent valve with gasket and coupling 5 Elbow 2x 6 Line regulating valve 7 Shut off valve 2x 8 Coupling 9 Magnet 10 Cover plate 2 part 11 Input 1 2x 12 Output 1...

Page 7: ...E Cylinder diameter 420 mm F Cylinder height 685 mm G Flange diameter 140 mm Input output connection 1 inside thread Drain connection 1 inside thread 4 3 Performance data ELYSATOR Typ 50c ELYSATOR Ty...

Page 8: ...arated out efficiently an installation position close to the diffusion point underfloor heating should be selected The appliances in the ELYSATOR industrial series are designed for installation in a s...

Page 9: ...g the air 6 2 Setting the throughput Set the throughput according to the values in the chart in chapter 4 3 A On indicator 1 mark the reference value for setting the valve B Pull ring 2 to open the sl...

Page 10: ...During operation the ELYSATOR function must be checked every 6 months This is shown on the wear indicator on the duct As long as the wear indicator is in the green zone the anode is operating normally...

Page 11: ...OR and fill it with tap water If after one day with the shut off valves closed the wear indicator reads a higher value than before then the system is OK The ELYSATOR can then be re filled with deminer...

Page 12: ...9 7 Open the drain valve if blocked use a screwdriver or wire to clear it 8 Release the vacuum by pressing on the air valve on air vent connection 4 9 Connect drain 3 to the fresh water supply 10 Fill...

Page 13: ...a size 10 open ended spanner 9 Slide the anodes out from the anode tree 10 Slide new anodes into the anode tree 11 Screw new anodes onto the isolating screw 12 Insert new flange gasket 6 13 Insert the...

Page 14: ...anode 8 5 Replacing the wear indicator and the control button Fig 7 3 1 Remove top cover panels 10 2 Remove contact blade 3 from the blade terminal 3 Loosen flange screw 4 with cable connection 4 Rem...

Page 15: ......

Page 16: ...Service booklet Installer Date of installation Project Device no Sludge removal interval Maintenance interval Date Job Meter mA Company signature...