31
Fig. 16 LOG CHUTE
9. Fold the log loader chute down.
10. Install and tighten the nuts for the log loader
chute anchor bolts, on the left and right side.
11. Crank the bracing jacks till the jack feet are
firmly on the ground.
12. Unfold the lead in chute
13. Unclip the winch hook from the log stabilizer
chain.
14. Check that the log stabilizer chain allows
the stabilizer to move freely and not hinder
the log.
15. Finally, adjust the splitter chute to the re-
quired height, crank the bracing jacks so
they are firmly on the ground, but ensure the
front lip of the lead in chute is on the ground
(to avoid catching on logs). If required, ad-
just the drop leg jacks so the lead in chute is
level with the ground and the bracing jacks
have a firm grip.
Anchor Bolt Nuts
(left & right
Jack
Feet
Winch Hook
Log Stabilizer
Chain
16. Move the wagon, trailer or conveyor into posi-
tion under the discharge chute if desired or
appropriate for your application.
17. Reverse the above procedure when preparing
to leave the work site or transporting.
Bracing Jack
Drop Jack
Lead in Chute
Splitter Chute
Lead in Chute
Log Loader
Chute