Chapter 1 System Information
This Chapter gives an introduction of hardware information so that users can
quickly set up the system.
1.1 Starting EVKM-MXM-6410
Before starting, please check the jumper to make sure that the jumper
configuration is matching your demand. Figure 1.1 shows the steps.
Figure 1.1 Starting EVKM-MXM-6410
1. Press the MXM-6410 module and screw it tightly.
2. Connect the console port (UART0, CN20 on figure 1.3) to the console
cable, then to a null modem cable and then connect to your PC. Open
up the DNW 0.6c (Click “
Connect
” at “
Serial Port
” tab) and set the
baud rate to 115200, 8N1, no hardware flow control. (At
“
Configuration
” Tab
Æ
“
Options
” of DNW program serial port setting.)
3. Connect the backlight invert board power to CN9.
4. Connect the LCD FPC Cable (Top Contact) or LVDS cable.
5. Connect the power cable to power board.