CHAPTER
FOUR
MAINTENANCE
After installation, maintenance must be performed according to the present manual.
To facilitate this work whereby are described the procedures and methods to be followed. The maintenance manual of
the PCS Control Station is divided in two parts:
4.1 Preventive Maintenance
Preventive maintenance is required to ensure the optimal working state for the platform.
Post-flight
1. Switch off the system by pressing the button for 2 seconds (until the blue light turns off).
2. Check all connectors, in case of abnormality or damage, please contact us for replacement.
3. Attach all protection cups to all connectors in order to keep them free of dust.
4. Store the system in the supplied rugged case.
5. It is a good praxis to clean all connectors with a good contact cleaner after working in adverse conditions.
4.2 Corrective Maintenance
Battery
If battery needs to be replaced you can ask us for a replacement or buy directly to the supplier (AIRBATT Energiepower,
internal number 8000910).
Battery replacement will void warranty, please contact Embention first.
To extract the battery please follow next steps:
1. Remove the 4 screws and open de device
27
Summary of Contents for Veronte PCS
Page 1: ...Veronte PCS Embention Apr 21 2022 ...
Page 2: ......
Page 4: ...ii ...
Page 8: ...Veronte PCS Fig 2 System Dimensions 4 Chapter 1 Technical ...
Page 10: ...Veronte PCS 1 6 Interfaces Fig 4 PCS Interfaces Parts identification 6 Chapter 1 Technical ...
Page 11: ...Veronte PCS Fig 5 PCS Interfaces Parts identification 1 6 Interfaces 7 ...
Page 14: ...Veronte PCS 10 Chapter 1 Technical ...
Page 24: ...Veronte PCS 20 Chapter 2 Installation ...
Page 36: ...Veronte PCS Fig 4 Basic Features Veronte PCS 32 Chapter 4 Maintenance ...