10
Components, latches, and bezels
Screws (2 per side)
Front
A and B
bezel bracket
Snap on bezels
Rail catch
Screw (1 per side)
Control Station and standby
power supply shelf
Disk-array enclosure
2 bracket screws each side
Front
Indentation
to center of
the rack
Install the lower
screw first
screws (2 per side).
Storage processor enclosure
and blade enclosure
Front
2 screws
each side
Install screws through rack
into the rail, 1a through 4a.
Install the bottom component first.
Ensure that each component
is secure before you install the
component above it.
1a
2a
2b
3a
3b
4a
1
2
3
4
5
CIP-001033MOD
Install the rack and rails with the provided screws.
1.
Starting with the bottom component fi rst, install each component.
2.
Ensure that each component is installed securely.
3.
Install the latches as you install the components.
4.
After all the components and latches are in place, snap on the bezels.
5.
For more information, refer to Celerra Tools on http://Powerlink.EMC.com