25
Install - Step 2 continued
Connect power cables
8. Power/cooling modules A and B on additional DAEs connect to different power
sources. Connect module A to the source shared with SPS A; connect module B to
the source shared with SPS B.
Do not connect a DAE power/cooling module other than
the DAE-OS to an SPS
.
Connect only the DAEs directly attached to the SPE at this time. After you
initialize the base system and confirm its error-free operation, you can power up
and configure additional DAEs.
The DAE will start immediately when connected to active AC power.