CX700 Powerdown
2-25
Setting Up and Starting a CX700 System
2. If the server connected to the CX700 is running the UNIX®
operating system, unmount file systems.
3. On the SPE, toggle each power supply’s on/off switch to the off
position.
Allow the power supply to complete its shutdown sequence before
removing the power source. An orderly shutdown that flushes all cache
can take up to several seconds before the host sends a
STOP
to the power
supply.
4. Power off the power strips A and B.
If you need to retain power to other systems in a rack/cabinet, leave the
power strips powered on. You can either toggle the DAE power switches
(if present) to the off position, or remove the DAE power cords.
Summary of Contents for CLARiiON CX700
Page 4: ...CX700 Hardware Reference iv ...
Page 8: ...CX700 Hardware Reference viii Contents ...
Page 18: ...xviii CX700 Hardware Reference Warnings and Cautions ...
Page 56: ...2 26 CX700 Hardware Reference Setting Up and Starting a CX700 System ...
Page 74: ...3 18 CX700 Hardware Reference Servicing a CX700 SPE ...
Page 96: ...A 18 CX700 Hardware Reference Technical Specifications and Operating Limits ...
Page 104: ...B 8 CX700 Hardware Reference Customer Support ...