background image

 
 

User manual Solar set XS 

E18-XSSolarset-EN-00

       www.emergoplus.com       

Page 10 of 15 

 

 

 

 

 

 

 

3.4 

Mounting MPPT Solar charger 

 
See manual of the Solar charger. 

3.5 

Gluing prescription 

 

 

 

 

 

 

Clean both adhesive surfaces with Activator. 

 

Allow  the  Activator  to  vaporise.  This  will  take  10-15 
minutes, depending on temperature and humidity. 

 

Roughen the surfaces to be glued with Scotchbrite Very 
Fine. 

 

Clean both adhesive surfaces with activator. 

 

Allow  the  activator  to  vaporise.  This  will  take  10-15 
minutes, depending on temperature and humidity. 

NOTE! 

For a good and solid adhesive bond it is very 
important  that  you  act  in  accordance  with 
instructions  below!    Surfaces  must  be  dry, 
grease-free, oil-free and dust-free. 

CAUTION! 
As soon as the Solar panel is exposed to light, 
it will start generating voltage! This voltage is 
not  touch-safe.  Bear  this  in  mind  when 
connecting the cabling! As an additional safety 
you  could  cover  the  solar  panel  or  protect  it 
against exposure to light, before you perform 
any  installation,  maintenance  or  cleaning 
activities. 

Summary of Contents for PowerXtreme SOLAR set XS100

Page 1: ...User manual SOLAR set XS100 SOLAR set XS130 SOLAR set XS200 SOLAR set XS260 EmergoPlus BV Informaticastraat 20 NL 4538 BT Terneuzen Tel 31 85 2018 158 www emergoplus com info emergoplus com...

Page 2: ...ct was developed using the latest technologies and quality systems We assure you that we will do our utmost to guarantee hassle free operation to make you satisfied with your purchase Our ultimate goa...

Page 3: ...General instructions 5 3 Unpacking and mounting installing 7 3 1 Components in packaging 7 3 2 Installation of Solar cables 8 3 3 Mounting Solar panel 9 3 4 Mounting MPPT Solar charger 10 3 5 Gluing p...

Page 4: ...d to install a functioning solar system onto your vehicle In addition to 1 or 2 solar panels the set includes an MPPT charger and the necessary installation materials The MPPT charger is an intelligen...

Page 5: ...talling and wiring the charger you must ensure that the connection with the Solar panel and the fuse is being detached 2 Check after the installation whether all connections are solid and reliable and...

Page 6: ...xcessive heat development This can cause the insulation layer of the wire and surrounding materials to melt and even cause a fire So make sure that all connections are properly tightened or tightened...

Page 7: ...x90x65 1 1 1 1 MPPT charger XS20s 150x105 6x61 5 1 1 1 1 Cable entry 1 1 1 1 Solar cable 4mm red 1 x MC4 M 5 m 1 1 1 1 Solar cable 4mm black 1 x MC4 F 5 m 1 1 Solar cable 4mm black MC4 M MC4 F 2 m 1 1...

Page 8: ...cables through the roof into the vehicle Make a 12 14 mm hole in the roof using a hole saw Lead the solar cables through the cable glands of the included roof throughput Glue the roof throughput acro...

Page 9: ...her with the panel Mark the position of the spoiler profiles by use of a marker or tape Glue both spoiler profiles to the spot marked on the roof in accordance with the gluing prescription After curin...

Page 10: ...tivator Allow the activator to vaporise This will take 10 15 minutes depending on temperature and humidity NOTE For a good and solid adhesive bond it is very important that you act in accordance with...

Page 11: ...en the adhesive surfaces Cut the nozzle of the sealant tube conform accompanying image First cut it horizontally then cut out a red triangle Apply a triangle adhesive bead onto the surface to be glued...

Page 12: ...from the ambient air Depending on the humidity the curing will take 1 to 2 days per mm of glue thickness The glue can be re coated with most of the common automotive paint systems also water based Res...

Page 13: ...heck whether the cabling is still in order contacts are tight there is corrosion there is wear on the cable insulation Repair or replace cabling if necessary 5 Decommissioning Electric appliances shou...

Page 14: ...sets have been extensively tested and checked Failure to act in accordance with the instructions and provisions of this manual may result in damage and or the unit will not meet our specifications Thi...

Page 15: ...es with the provisions of the following European directives 2014 35 EG Low Voltage Directive and that the following harmonized Standards have been used EN61730 1 2007 A2 2013 Safety qualification of p...

Reviews: