background image

 
 

User manual Solar set XS 

E18-XSSolarset-EN-00

       www.emergoplus.com       

Page 11 of 15 

 

For  an  esthetical  nice  result,  you  can  apply  tape  to 

locations that you don’t want glued.

 

 

Apply  the  distance  tape  to  one  of  the  surfaces  to  be 
glued. Remove the adhesive back of the tape.  

The  tape  will  ensure  fixation  during  the  curing  of  the 
sealant.  In  addition,  the  tape  ensures  the  required 
adhesive  thickness,  which  is  2-3  mm  between  the 
adhesive surfaces. 

 

Cut  the  nozzle  of  the  sealant  tube  conform 
accompanying  image.  First  cut  it  horizontally,  then  cut 
out a red triangle. 

 

 

 

Apply  a  triangle  adhesive  bead  onto  the  surface  to  be 
glued. Keep the sealant tube at 90° relative to the surface. 

 

Position the part and press the glue up to the desired glue 
thickness 

of 

2-3 

mm. 

 

 

 

 

Excessive glue can be removed or smoothed by use of an 
angled cut-off piece of PVC pipe. Before use, immerse the 
pipe  into  water  with  detergent.  Run  the  piece  of  pipe 
across the adhesive bead to achieve a smooth result. You 
can also lightly moisten the adhesive bead with a plant 

Summary of Contents for PowerXtreme SOLAR set XS100

Page 1: ...User manual SOLAR set XS100 SOLAR set XS130 SOLAR set XS200 SOLAR set XS260 EmergoPlus BV Informaticastraat 20 NL 4538 BT Terneuzen Tel 31 85 2018 158 www emergoplus com info emergoplus com...

Page 2: ...ct was developed using the latest technologies and quality systems We assure you that we will do our utmost to guarantee hassle free operation to make you satisfied with your purchase Our ultimate goa...

Page 3: ...General instructions 5 3 Unpacking and mounting installing 7 3 1 Components in packaging 7 3 2 Installation of Solar cables 8 3 3 Mounting Solar panel 9 3 4 Mounting MPPT Solar charger 10 3 5 Gluing p...

Page 4: ...d to install a functioning solar system onto your vehicle In addition to 1 or 2 solar panels the set includes an MPPT charger and the necessary installation materials The MPPT charger is an intelligen...

Page 5: ...talling and wiring the charger you must ensure that the connection with the Solar panel and the fuse is being detached 2 Check after the installation whether all connections are solid and reliable and...

Page 6: ...xcessive heat development This can cause the insulation layer of the wire and surrounding materials to melt and even cause a fire So make sure that all connections are properly tightened or tightened...

Page 7: ...x90x65 1 1 1 1 MPPT charger XS20s 150x105 6x61 5 1 1 1 1 Cable entry 1 1 1 1 Solar cable 4mm red 1 x MC4 M 5 m 1 1 1 1 Solar cable 4mm black 1 x MC4 F 5 m 1 1 Solar cable 4mm black MC4 M MC4 F 2 m 1 1...

Page 8: ...cables through the roof into the vehicle Make a 12 14 mm hole in the roof using a hole saw Lead the solar cables through the cable glands of the included roof throughput Glue the roof throughput acro...

Page 9: ...her with the panel Mark the position of the spoiler profiles by use of a marker or tape Glue both spoiler profiles to the spot marked on the roof in accordance with the gluing prescription After curin...

Page 10: ...tivator Allow the activator to vaporise This will take 10 15 minutes depending on temperature and humidity NOTE For a good and solid adhesive bond it is very important that you act in accordance with...

Page 11: ...en the adhesive surfaces Cut the nozzle of the sealant tube conform accompanying image First cut it horizontally then cut out a red triangle Apply a triangle adhesive bead onto the surface to be glued...

Page 12: ...from the ambient air Depending on the humidity the curing will take 1 to 2 days per mm of glue thickness The glue can be re coated with most of the common automotive paint systems also water based Res...

Page 13: ...heck whether the cabling is still in order contacts are tight there is corrosion there is wear on the cable insulation Repair or replace cabling if necessary 5 Decommissioning Electric appliances shou...

Page 14: ...sets have been extensively tested and checked Failure to act in accordance with the instructions and provisions of this manual may result in damage and or the unit will not meet our specifications Thi...

Page 15: ...es with the provisions of the following European directives 2014 35 EG Low Voltage Directive and that the following harmonized Standards have been used EN61730 1 2007 A2 2013 Safety qualification of p...

Reviews: