02/02
59
7. Thoroughly clean inside of the equipment enclosure using a
vacuum cleaner and low pressure air to remove any foreign
debris.
8. Reconnect the UPS input mains power.
9. Start the UPS and transfer the load to the inverter following the
appropriate operating procedure.
10. If possible, check the battery autonomy time by opening the
rectifier input power switch (Q1) with the UPS on-load. Close the
rectifier input power switch (Q1) immediately the DC busbar voltage
fails within 5 volts of the battery end of discharge voltage. (Note the
end of battery discharge is assumed when the battery voltage fails to
320V DC for a 380V AC system; 340V DC for a 400V AC system;
and 340V DC for a 415V AC system). At this voltage the battery
circuit breaker will trip and the load will transfer to bypass. Ensure that
the available battery autonomy time meets the installation
specifications.
5.3.4 Extended Service
We recommend that
ALL
the input / output power cables and their
connections are checked periodically. As this requires the UPS to be
completely shut down such a check should be carried out on an
‘opportunity’ basis but at an interval not exceeding 2 years.
5.3.5 Battery Maintenance
The batteries used with the UPS are generally of a sealed, valve-
regulated type, and the only maintenance requirement is to ensure
that the cells are kept clean and dry. Maintenance procedures
appropriate to both valve-regulated and non-sealed batteries vary,
and should be obtained from the battery manufacturer.
7400M - Series UPS User Manual
Single Module and 1+N Parallel System