Installation Manual 

 

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS 

381333-406 

ASCO Power Technologies 

Page 1 

 
 
 
 
 

 

 

DANGER is used in this manual to warn of a 
hazard situation which, if not avoided, will result in 
death or serious injury. 

 
 
 
 
 

WARNING is used in this manual to warn of a 
hazardous situation which, if not avoided, could 
result death or serious injury. 

 
 

 

CAUTION is used in this manual to warn of a 
hazardous situation which, if not avoided, could 
result in minor or moderate injury. 

 

Rating Label 

Each transfer switch contains a rating label to define the loads 

and fault circuit withstand/closing ratings.  Refer to the label 

on the transfer switch for specific values. 

 
 
 
 
 

Do not exceed the values on the rating label. 
Exceeding the rating can cause person injury or 
serious equipment damage. 

 

An experienced licensed electrician must install the transfer 
switch. 

Installation 

These transfer switches are factory wired and tested.  
Installation requires mounting, connecting service cables, and 
connecting engine start and auxiliary control circuits (if 
required.).

 

 
 

 

 
 
 
 

 

Supporting Foundation 

The supporting foundation for the enclosure must be level and 
straight.  Refer to the applicable enclosure outline drawing 
included with the transfer switch for all mounting details 
including door opening space. 

If bottom cable entry is used, the foundation must be prepared 
so that the conduit stubs are located correctly.  Refer to the 
enclosure outline drawing for specified area and location.  
Provide cable bending space and 1 inch minimum clearance to 
live metal parts.  When a concrete floor is poured, use 
interlocking conduit spacer caps or a wood or metal template 
to maintain proper conduit alignment. 

 

Mounting 

Refer to the outline and mounting diagram and mount the 
transfer switch according to details and instructions shown on 
the diagram.  Mount it vertically to a rigid supporting 
structure.  Level all mounting points by using flat washers 
behind the holes to avoid distortion of the transfer switch. 

 
 

 
 

Protect the transfer switch from construction grit 
and metal chips to prevent malfunction or 
shortened life of the transfer switch. 

 

381333-406 

Refer to the outline and wiring drawings provided 
with the 3ATS, 3NTS, 3ADTS, or 3NDTS for all 
installation and connection details and accessories.

    

DANGER 

 

 

 

 

!

      

WARNING 

 

 

 

 

!

      

CAUTION 

 

 

 

 

!

Refer to 

User’s Guide 381333-400

 for the Goup G 

Controller status display messages, time delays, 
pickup and dropout settings, and adjustments. 

 

 3ATS, 3ADTS, 3NTS, 3NDTS 

G-design 1600-3000 A Transfer Switches 

Installation Manual 

      

WARNING 

 

 

 

 

!

NOTICE

INSTALLATION 
Mounting ..........................................................1
Power Connections .........................................2
Engine Starting Contacts.................................2

 

FUNCTIONAL TEST 
1- Manual Operation........................................3
2- Voltage Checks ...........................................4
3- Electrical Operation .....................................6

 

TESTING & SERVICE 
Transfer Test ...................................................6
Preventive Maintenance ..................................6
Manual Load Transfer .....................................6

 

TROUBLESHOOTING ....................................7

 

INDEX..............................................................8

Table of Contents 

Summary of Contents for ASCO 3ATS

Page 1: ...d the foundation must be prepared so that the conduit stubs are located correctly Refer to the enclosure outline drawing for specified area and location Provide cable bending space and 1 inch minimum clearance to live metal parts When a concrete floor is poured use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment Mounting Refer to the outline and mo...

Page 2: ...are solderless screw type and will accept the wire sizes listed on the drawings provided with the transfer switch Be careful when stripping insulation from the cables avoid nicking or ringing the conductor Remove surface oxides from cables by cleaning with a wire brush When aluminum cable is used apply joint compound to conductors Tighten cable lugs to the torque specified on rating label Harnesse...

Page 3: ...aintenance handle is provided on the transfer switch for maintenance purposes only Manual operation of the transfer switch should be checked before it is energized operated electrically Do not manually operate the transfer switch until both power sources are disconnected open both circuit breakers 1 After deenergizing both power sources open the enclosure door Locate and remove the maintenance han...

Page 4: ...ttings in the controller Close the normal source circuit breaker The normal source accepted and the load on normal lights should come on 1 2 Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch normal source terminals Close the emergency source circuit breaker Start generator if necessary The emergency source accepted light should come on 3...

Page 5: ...ransfer button The engine should start and run within 15 seconds For 3NTS 3NDTS the generator must be started manually at the generator The emergency source accepted light should come on 2 For 3ATS 3ADTS the transfer switch should transfer to the emergency position The load on emergency light should come on and the load on normal light should go off For 3NTS 3NDTS press the transfer button for loa...

Page 6: ...s required Renew factory lubrication if the transfer switch is subjected to severe dust abnormal operating conditions or if the TS coil is replaced Order lubrication kit 75 100 Check all cable connections retighten them Torque to values shown on the transfer switch label Replacement Parts When ordering replacement parts provide the Serial No Bill of Material No BOM and Catalog No from the transfer...

Page 7: ...meter should read at least 90 of nominal phase to phase voltage between transfer switch terminals EA and EC or EL1 and EL2 for 2 pole switches There are factory settings For 3ATS 3ADTS the transfer switch does not transfer the load to normal source when normal returns or after transfer test Wait for the feature 3A time delay For immediate retransfer press the transfer button bypass timer If inphas...

Page 8: ...tion 6 installation 2 insulator backing piece 2 WARNING 2 L lights 4 5 7 line connections 2 load on emergency light 4 5 load on normal light 4 5 lubrication 6 M maintenance 6 maintenance handle 3 6 WARNING 3 6 manual load transfer 6 WARNING 3 6 manual operation 3 WARNING 3 6 manual transfer 3NTS 5 membrane controls 4 5 mounting 2 N non automatic 3NTS 5 7 normal source accepted light 4 5 not in aut...