Installation, Operation and Maintenance Manual
RGS011110-2 Rev. 0
April 2016
20
Section 4: Maintenance
Maintenance
6.
Coat the new pins and rollers with the appropriate Bettis approved lubricant
and reassemble them. Apply high strength thread locker. Align pin slot with
hole in the clevis and install set screw, torque the pin set screw to the corre-
sponding value in the table below.
Table 6�
Model
Ft-Lbs
Nm
2200
35
4
2250
44
5
2300, 2375
106
12
2488, 2575
212
24
Figure 22
7.
Repeat steps 2 to 6 of this Section on the second force module.
8.
Repeat steps 16 to 18 of Section 4.5.