PACSystems™ RX3i DNP3 Outstation User Manual
Section 2
GFK-3103B
June 2020
Configuration of DNP3 Outstation
24
2.3
Start DNP3 Outstation in CPU
To configure the DNP3 Outstation CPU using PME:
1.
Once the configuration for DNP3 Outstation is complete, navigate to the Target button on the
ribbon bar and select Connect. This action will connect toggle the online connection with the
target CPU.
2.
Next, select Download the to download the Hardware Configuration to CPU.
3.
The DNP3 Outstation protocol will initialize and the CPU will be ready to begin accepting DNP3
Master connections.
To configure the CPE115 DNP3 Outstation CPU using SVC_REQ (service request);
1.
Set the required ST Block configuration parameters for DNP3 Outstation
2.
Navigate to the Target button on the ribbon bar and select Connect. This action will connect toggle
the online connection with the target CPU.
3.
Next, select Download the to download the Hardware Configuration to CPU.
4.
Use SVC_REQ #130 start DNP3 Outstation protocol to begin accepting the DNP3 Master
connections.
For more information on using service request sub-functions, refer section 5.14.2.
2.4
DNP3 Master Communication
To establish the communication between Outstation and Master, set Master IP address, TCP/IP Port
Number, and Source LLA as per the DNP3 Outstation Configuration.
Use Station Manager tool and ‘stat a’ command to view the DNP3 Outstation Configuration
Parameters. For more information on the
‘
stat a
’ command output
, refer section Appendix A.