The unit frame is bolted to the shipping pallet to ensure safety during shipping. Emerson
recommends keeping the unit bolted to the pallet and using a pallet jack to transport the unit to its
installation location.
To unload the UPS:
1. Move the UPS to its installation site and remove the package paper.
2. Use a 17mm (11/16") wrench, to remove the four mounting bolts from the pallet brackets (see
Figure 14
).
3. Remove the mounting brackets from the UPS with a 10mm wrench or socket or a #3 Phillips
screwdriver.
Figure 14 Remove the mounting brackets
4. Raise the four leveling feet to provide clearance between the pallet and the UPS frame.
5. Connect the ramp to the UPS pallet, as shown in
Figure 15
.
6. Roll the UPS slowly down the ramp until it is on a level surface, as shown in
Figure 15
.
Figure 15 Connect the ramp and remove UPS
NOTE
This UPS is very heavy. At least two people should assist in unloading it from the pallet.
A
Mounting Bolts
(4 places)
Mounting Bracket
Pallet
Detail A
UPS
Summary of Contents for Liebert APS
Page 1: ...AC Power For Business Critical Continuity Liebert APS User Manual 5 20kVA Modular UPS ...
Page 2: ......
Page 8: ...vi ...
Page 101: ...Specifications 93 Liebert APS NOTES ...
Page 102: ...Specifications Liebert APS 94 ...
Page 103: ......