Installation
Liebert
®
APS
™
18
2.3.2
Rack Installation
1. Install the cage nuts on the corresponding positions in the rack, as shown in
Figure 18
.
a. Install cage nuts in the two lower square holes of 1U space and in the two upper square holes
of 2U space of all four rack posts. These cage nuts will secure the optional shelf that will
support the weight of the Liebert APS.
b. Install a cage nut in the middle square hole of 4U, 6U, 10U, 12U spaces, respectively, again in
all four posts. The cage nuts will help secure the UPS in the rack.
Figure 18 Install cage nuts
2. Install the rack-mount shelf on the corresponding position between 1U space and 2U space on the
bottom of the rack, as shown in
Figure 19
.
Figure 19 Install the tray
3. Install the guide rails (ramp) in the mounting slot at the front of the tray, as shown in
Figure 20
.
A
Detail A
Floating Nut
B
Detail B
Screw,16 places
Tray
Summary of Contents for Liebert APS
Page 1: ...AC Power For Business Critical Continuity Liebert APS User Manual 5 20kVA Modular UPS ...
Page 2: ......
Page 8: ...vi ...
Page 101: ...Specifications 93 Liebert APS NOTES ...
Page 102: ...Specifications Liebert APS 94 ...
Page 103: ......