Chapter 2 Single UPS Installation And Commissioning 11
Liebert
®
ITA 5kVA And 6kVA UPS User Manual
Remove the fixing screws
on the display panel
Rotate the display panel
90
°
counter clockwise
Tighten the fixing screws on the
display panel
90
°
A
A amplified
Fixing screws (2 pcs)
Figure 2-7 Adjusting the display panel
Note
1. For the tower installation, you need to adjust the display panel; for the rack installation, ignore this step.
2. When adjusting the display panel, you do not need to open the chassis of the UPS.
2. Install the plastic panel.
1) Take out the plastic panel from the UPS package.
2) Align the plastic panel with the UPS display panel, and gently press the metal buckles on both sides of the plastic
panel into the square holes on the UPS front panel according to the direction shown in Figure 2-3.
Square hole
Plastic panel
Display panel
Figure 2-8 Installing the plastic panel
Note
You do not need to uninstall the UPS when the plastic panel is removed. Press the two ends of the plastic panel with hands, and
gently pull down the plastic panel to remove it, as shown in Figure 2-4.