120
Configuring and operating the system
UM6C55C (P7000597)
User Manual
Standard 10.00 (March 2008)
Lorain Power System (AP6C55CA/CB)
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
•
select the desired language in the drop-list menu of the Choose language
among available field, and
•
click on the
button to confirm the new language.
Note:
The available choices are “English_NA” (North American English)
and “English” (European English).
5.6.5.26. IP Network Settings
Clicking on
IP Network Settings
in the submenu screen for System Manager
CIP settings will display the following screen.
Screen 49
This screen is used to enter or modify the
IP
Address, the Subnet Mask and
the Default Gateway for communication with the System Manager CIP over
the Internet interface. For each item, a line shows the current set of numbers.
To enter or modify the numbers for a specific item, proceed as follows:
•
enter the new set of numbers in the four fields of the applicable line, and
•
click on the
button to confirm the new set of numbers.
•
the system will then prompt “Do you want to restart the System
Manager CIP, Yes or No?”; it is necessary to restart the System
Manager IP to validate the new
IP
network settings.
5.6.5.27. PPP Settings
Clicking on
PPP Settings
in the submenu screen for System Manager CIP
settings will display the following screen.
Summary of Contents for Lorain CIP 48120 AP6C55CA
Page 2: ......