a) Order the front access AC Input Termination Assembly per List
, or
module mounting shelves with AC input cable assemblies, see PD588705300).
b) Order rectifier modules as required, P/N
c) Order optional converter interface components per List
d) Order optional DC-DC converter modules as required, P/N
6) Order battery trays as required per List
a) Order batteries as required per “
” under ACCESSORY DESCRIPTIONS.
b) Order “
Optional Battery Tray Battery Disconnect Circuit Breaker and Housing Kits
” as required.
c) Order “
Optional Battery Tray Front Battery Cover Kits
” as required.
List 6: 2
nd
Supplemental Bay Common Equipment (Power and Distribution or Distribution Only),
Located Remote from Main Bay
Features
♦
Provides common equipment for one remote “power and distribution or distribution only” bay rated for up
to 2000 amperes of distribution. Includes interbay communications cabling.
♦
Accepts one (1) distribution cabinet (options are 1-row, 2-row, 3-row, or 4-row cabinet).
♦
Includes SM-DU (provides bay interface to ACU+ Controller).
♦
Accepts up to six (6) module mounting shelves Spec. No. 588705000 (including expansion shelves).
or
Accepts up to six (6) module mounting shelves Spec. No. 588705300 (including expansion shelves).
Restrictions
When the system is equipped with a List
, or
front access Input Termination Assembly,
refer to the restrictions under these list descriptions.
Will not accept List
converter interface components.
Will not accept dual voltage distribution panels.
Order maximum of one (1) List
is ordered. Order List 3 or List 6, not both.
Interbay power cabling is not included, and must be separately provided per site requirements.
If low voltage disconnect (List LL or List LB) is to be included, the Main Bay (List 1) of the system must also
have low voltage disconnect (List LL or List LB).
Ordering Notes
1) Order a relay rack or shipping brackets per “
Relay Racks and Shipping Brackets
” under ACCESSORY
DESCRIPTIONS. If required, order relay rack transition plates per “
Transition Plates to Mount Relay
Rack on Top of GNB Absolyte IIP Batteries
” under ACCESSORY DESCRIPTIONS.
, or
a) Order up to four (4) (per the capacity of the distribution cabinet ordered) distribution panels, battery
disconnect panels, and/or return bar panel as required per “
Single Voltage Distribution Panel
”,
Battery Disconnect Distribution Panel
” under LIST DESCRIPTIONS.
b) Order battery disconnect contactors and low voltage disconnect options as required per “
Low Voltage Disconnect Options
” under LIST DESCRIPTIONS.
c) Order fuses and/or circuit breakers as required per “
” under ACCESSORY
DESCRIPTIONS.
d) Order input and load distribution lugs, lug adapters, and lug hardware kits as required per “
” under ACCESSORY DESCRIPTIONS.
e) Order a distribution cabinet top shield as required per List
f) If distribution only, order a bottom rear distribution cabinet cover per List 4.
g) Order a battery shunt as required per List
, or