background image

Page 

2

SDU 24-BATEM Instruction Manual  •  A272-148 Rev. 2 9/2021

BaCK-Up time of sdU dC Ups with sdU 24-Batem (in minUtes) versUs load perCentaGe

remarK

: Resistive loads were used to measure the battery run time, using other types of load may result in different battery run time. Run times are based on 

new, fully charged battery module at a temperature of 25°C (77°F). Run times may vary due to manufacturing variance of the individual batteries.

dc uPs with sdu 24-batem external battery Pack (ebP) 

The external battery module SDU 24-BATEM includes two (2) user replaceable batteries. 

sdu 10-24b with sdu 24-batem

load

20% (2a)

40% (4a)

60% (6a)

80% (8a)

100% (10a)

1 EBP

135

52

28

19

14

sdu 20-24b with sdu 24-batem

load

20% (4a)

40% (8a)

60% (12a)

80% (16a)

100% (20a)

1 EBP

48

17

9

6

4

sdU 24-Batem speCifiCations

Parameter

sdu 24-batem

nominal Voltage

24 VDC

Protection

Circuit Breaker: 24V, 25A

charging current

1.2

enclosure dimension in. (mm)

11.5 x 5.57 x 4.57 (292 x 142 x 116)

enclosure type

NEMA 1

terminal connector type

Polarized Powerpole Connectors

batteries 

Replaceable - Refer to the instructions for replacement.

accessories

6 ft polarized battery cable

operating temperature

-20o to +50o C

charge temperature

0o to +40o C

storage temperature

-20o to +40o C

Humidity

95% no condensation

Certifications

cULus Listed: UL 508/CSA 107.1, UL/CSA 61010-1, UL/CSA 61010-2-201

 

cRUus: UL/CSA 60950-1, UL/CSA 62368-1
CE/UKCA: IEC/EN 62368-1, IEC/EN 61010-1, 

 

IEC/EN 61010-2-201

Weight lbs (kg)

16 (7.26)

mounting 

Wall/Chassis Mounting

Summary of Contents for SDU 24-BATEM

Page 1: ... harmful to skin and eyes It may be toxic For battery recycling information contact CSB recycling network at 1 800 738 7372 what s included 1 SDU 24 BATEM External battery module 2 SDU 24 EXTBC6 Pair of 6 foot polarized cables for connecting the external battery module to the power module NOTE The circuit breaker must be in the open position O prior to installation SDU 24 BATEM Installation The SD...

Page 2: ...A 1 EBP 135 52 28 19 14 SDU 20 24B with SDU 24 BATEM Load 20 4A 40 8A 60 12A 80 16A 100 20A 1 EBP 48 17 9 6 4 SDU 24 batem specifications Parameter SDU 24 BATEM Nominal Voltage 24 VDC Protection Circuit Breaker 24V 25A Charging Current 1 2 Enclosure Dimension in mm 11 5 x 5 57 x 4 57 292 x 142 x 116 Enclosure Type NEMA 1 Terminal Connector Type Polarized Powerpole Connectors Batteries Replaceable ...

Page 3: ...e Dispose of old batteries according to local codes CAUTION ELECTRICAL SAFETY PRE CAUTIONS MUST BE FOLLOWED WHEN INSTALLING OR SERVICING THIS EQUIPMENT TO PREVENT RISK OF ELECTRICAL SHOCK TURN OFF AND LOCK OUT ALL POWER SOURCES TO THE UNIT BEFORE MAKING ELECTRICAL CONNECTIONS OR SERVICING CAUTION WHEN REMOVING AND INSTALLING THE NEW BATTERIES EXTREME CARE MUST BE USED NOT TO SHORT METAL CHASSIS PA...

Page 4: ...to Replace the Batteries Step 1 Remove four 4 screws from cover and slide cover forward off enclosure Step 2 Remove wires from battery posts Step 3 Remove four 4 screws from enclosure but secure bracket in place and then slide bracket forward from enclosure Step 4 Remove failed batteries and insert new Replaceable Batteries ...

Page 5: ...rs 2021 Emerson Electric Co All rights reserved United States Headquarters Appleton Grp LLC 9377 W Higgins Road Rosemont IL 60018 United States T 1 800 621 1506 Australia Sales Office Bayswater Victoria T 61 3 9721 0348 Europe ATX SAS Espace Industriel Nord 35 rue André Durouchez CS 98017 80084 Amiens Cedex 2 France T 33 3 2254 1390 China Sales Office Shanghai T 86 21 3338 7000 Canada EGS Electric...

Reviews: