SDU 24-BATEM Instruction Manual • A272-148 Rev. 2 9/2021
Page
3
sdU dC Ups wirinG diaGram - dC Ups with external Battery modUle sdU 24-Batem
note:
Only one (1) SDU 24-BATEM module can be connected with the power module SDU 10-24B or SDU 20-24B.
sdU 24-Batem Battery replaCement instrUCtions
!
caution –
A battery can present a risk of electrical shock and high short circuit current. The following precautions should be observed before replacing
the batteries:
•
Remove rings, watches, and other metal objects.
• Do not lay tools or other metal objects on top of the batteries.
• Do not dispose of batteries in a fire. The batteries may explode.
• Dispose of old batteries according to local codes.
!
caution –
ELECTRICAL SAFETY PRE-CAUTIONS MUST BE FOLLOWED WHEN INSTALLING OR SERVICING THIS EQUIPMENT. TO PREVENT
RISK OF ELECTRICAL SHOCK, TURN OFF AND LOCK OUT ALL POWER SOURCES TO THE UNIT BEFORE MAKING ELECTRICAL CONNECTIONS
OR SERVICING.
!
caution –
WHEN REMOVING AND INSTALLING THE NEW BATTERIES, EXTREME CARE MUST BE USED NOT TO SHORT METAL CHASSIS
PARTS ACROSS THE BATTERY TERMINALS AND NOT TO SHORT THE BATTERIES TO EACH OTHER OR PERSONAL INJURY MAY RESULT.
note:
Caution should be exercised when replacing the batteries because the load is unprotected from disturbances and power outages during this procedure.
sdu 24-batem batteries replacement
The following battery type must be used as a replacement in this product.
manufacturer
type
rating
CsB
GP1272
12 V dc, 7.2 Ah