background image

TB-6596

 Page 2 of 7

© 2019 DESCO INDUSTRIES INC

Employee Owned

EMIT 

- 3651 Walnut Avenue, Chino, CA 91710 • (909) 664-9980 • Website: 

DescoEMIT.com

Packaging

1  SmartLog Pro®

1 Turnstile 

1  Wall Mounting Bracket

1  Dual Independent Foot Plate

2  Slanted Standoffs

1  Socket Head Cap Screw, 10-32 thread

1  Internal Tooth Lock Washer

1  Allen Wrench, 5/32"

1  Turnstile Anchor Kit

8  Turnstile Keys

1  Certificate of Calibration

Installation

Installing the Turnstile

100 VAC / 110 VAC / 220 VAC and Ethernet access 

are needed at the location of every SmartLog Pro® with 

Turnstile prior to installation.

Click here

 to download the Alvarado EDC Installation 

and Maintenance Manual and see instructions on 

anchoring and wiring the turnstile. Do not install the 

SmartLog Pro® and its mounting hardware to the 

turnstile until it is properly anchored and wired.

Installing SmartLog Pro® to the Turnstile

See 

TB-6594

 to learn more about the features and 

components of the SmartLog Pro®.
1.  Open the turnstile’s lid using the included keys. 
2.  Install the SmartLog Pro® onto the turnstile’s lid 

using the 2 slanted standoffs, 1 socket head cap 

screw and 1 internal tooth lock washer. See Figure 

2. 

 

NOTE: This mounting is also sold separately as 

EMIT item 50783. It may be used to mount the 

SmartLog Pro® onto other turnstile models. See 

page 7 for the fabrications that need to be made 

to the turnstile's lid in order to mount the SmartLog 

Pro®. 

3.  Connect the Ethernet cable, terminal block, foot 

plate cable, and power adapter to the back of the 

SmartLog Pro®. 

4.  Locate the power switch inside the turnstile cabinet, 

and set it to ON. 

5.  Locate the power switch on the back of the 

SmartLog Pro®, and set it to ON. 

6.  Locate the foot plate cable at the base of the 

turnstile and connect it to the Dual Independent 

Foot Plate, so operators can place their feet on it 

while performing tests at the turnstile’s entrance. 

7.  Complete the installation by establishing 

communication to the SmartLog Pro® via the 

Ethernet cable. See the “Network Setup” procedure 

in 

TB-6594

 for more information.

Socket Head Cap Screw

Lock Washer

Short Slanted Standoff

Turnstile Lid

Long Slanted Standoff

Figure 2. Installing the SmartLog Pro® to the turnstile’s 

lid

Figure 3. Installing the Dual Independent Foot Plate

Summary of Contents for SmartLog Pro 50723

Page 1: ...tile The SmartLog Pro with Turnstile is available as the following item numbers Item Input Voltage 50723 100 VAC 50781 120 VAC 50782 220 VAC ESD Association Information Compliance verification should...

Page 2: ...martLog Pro onto the turnstile s lid using the 2 slanted standoffs 1 socket head cap screw and 1 internal tooth lock washer See Figure 2 NOTE This mounting is also sold separately as EMIT item 50783 I...

Page 3: ...in front of the RFID icon for a full second if using proximity badges See Figure 5 3 Follow the prompt on the SmartLog s display 4 When performing a footwear test be sure to place both feet on the du...

Page 4: ...aking a short walk to build a sweat layer for better conductivity Figure 7 Performing a single wire wrist strap test Figure 6 Performing a footwear test 7 Pass through the turnstile The turnstile will...

Page 5: ...0A Cable Length 5 ft 1 5 m Turnstile Input Voltage and Frequency 110VAC 50 60 Hz 50781 220VAC 50 60 Hz 50782 Operating Temperature 70 F to 85 F 21 C to 30 C for 1 gigohm test limit 41 F to 85 F 5 C t...

Page 6: ...INDUSTRIES INC Employee Owned EMIT 3651 Walnut Avenue Chino CA 91710 909 664 9980 Website DescoEMIT com Figure 10 Dimensions of the EMIT SmartLog Pro with Turnstile 27 0 69 cm 9 5 24 cm 25 0 64 cm 40...

Page 7: ...980 Website DescoEMIT com Figure 11 Turnstile lid cutout dimensions for mounting the SmartLog Pro using the 50783 Turnstile Mounting Kit all dimensions are in inches Limited Warranty Warranty Exclusio...

Reviews:

Related manuals for SmartLog Pro 50723