Agreement
(Emmvee Photovoltaic Power Private Limited and the Beneficiary)
THIS AGREEMENT made on the ..................day of....................................month , year...................................
between Mr/Ms.................................................................. (Name), Aged ………………………… S/O / ......
.......................................................D/O…………………………………………………………………. of …………
…………………………………………………………........... (Address) (hereinafter “Customer”), of the one part,
and (name) of .......................................................................... (name of agency) (hereinafter “the Agency”)
of the other part:
WHEREAS …………………is a registered beneficiary having registration no. ………………. for the installation
of 1 kW solar Rooftop power plant under “10000 Rooftop solar power plants off-grid programme of ANERT
(hereinafter “the Programme”).
WHEREAS M/s. EMMVEE Photovoltaic Power Pvt. Ltd. is an empanelled agency for the implementation of the
programme with empanelment no. EA/2012/24 of ANERT.
Whereas the Agency has accepted the work order from the customer for the installation of solar power plant
for the sum of Rs.……………………………....... (hereinafter “the Contract Price”)
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
The agency shall install solar power plant at the site of customer as per the details in the Pre-installation
survey report prepared after site visit and the terms contained in the work order issued by the customer.
The system installed should comply with technical requirements of Ministry of New and Renewable
Energy, Govt. of India (MNRE) and Agency for Non Conventional Energy and Rural Technology (ANERT).
The installation should be completed and the commissioning report by the Agency/Customer to be submitted
to ANERT district office within 45 days of signing this agreement.
The rate quoted by the Agency shall be inclusive of all taxes and duties, and shall cover the Pre- installation
survey report, transportation, handling charges, supply, installation and commissioning.
The whole system should be warranted for 5 years and the Solar module provided should have a
performance warranty of 90% of the rated output at the end of 10 Years and 80% at the end of 25 years.
Agencies shall conduct periodic service visits at least once in six months during the warranty period of 5
years.
Any complaint or service call from the customer shall be attended by the agency within 48 hours and
problems cleared within 4 days.
The release of payment by the beneficiary to Agency shall be as per the mutually agreed terms as given
below.