28)
Test certificate no.
Name of the testing lab
Southern Batteries
339EATDBT09S0063-S0065, CPRI – Bangalore
HBL
NCTFN/REP/June-12/08-1 NABL
EXIDE
ERTL(E)/TES/E182/0023/10-11 ERTL
29)
Make of the PCU
MRO-TEK / Power One
30)
Capacity of the PCU
1 kW
31)
Test certificate no.
Name of the testing lab
MRO-TEK
DCCD – 12907 & CPRI /ERED/SPV/INV/11/201 CPRI
Power One
01100287 001 TUV Rheinland
32)
Copy of BOM (Bill of Material) offered to the
customer
Attached
Price Details
33)
Base price of the system
34)
Additional cost of the structure (If required)
35)
Additional cost of the wiring (If required)
36)
Total cost of the installation
37)
Date of completion of installation (proposed)
Enclosures:
1. Pre-installation Site Photograph (2 Copies) Annexure-1
(also will be emailed to the concerned district office)
2. Test certificate for Module technical compliance-Annexure-2
3. Test certificate for Battery technical compliance-Annexure-3
4. Test certificate for PCU technical compliance-Annexure-4
Signature Signature
Name of the Beneficiary Name of the representative from the agency
Place
Date
White (original)
: Company copy
Pink (duplicate)
: Customer copy
Yellow (triplicate)
: Representative copy