eMotimo Dana Dolly integration instructions
5
Carriage mounting:
Belt routing:
Belt alignment:
Belt clamp orientation
General Principles:
1.
Align Motor Mount over 1/4” and 3/8”
through holes on the Dana Dolly.
2.
Mount Motor Mount to Dana Dolly using the
1/4-20” and 3/8-16” hardware in the following
order (starting with Dana Dolly):
1) Carriage Mount & Motor
2) 1/4-20” and 3/8-16” rubber washers
3) 1/4-20” and 3/8-16” metal washers
4) 1/4-20” and 3/8-16” flathead screws
Always route belt over pulley with teeth down.
Wrap under both idlers.
Manually slide the dolly towards the belt
clamp to check alignment. Align clamp with
the edge of the belt by sliding it left or right
on the end bracket. Tighten down at the
bottom of the clamp the with 1/4-20 clamp
thumbscrew to lock the clamp in place.
Always mount clamps with thumbscrews facing
outwards.
1
2
3
4