37607-1-0817
Page 24
INSTALLATION (continued)
FLUSH WALL INSTALLATION
FRONT TRIM OR
NON-COMBUSTIBLE MATERIAL
(INSTALLATION IS OPTIONAL)
JOINT BETWEEN FINISHED
WALL AND UNIT SEALED
WITH 300° F, 149° C SEALANT
MATERIAL (SEALANT IS OPTIONAL)
24”
TO TOP OF CHASE
2 X 4
HEADER
FINISHED WALL
(COMBUSTIBLE)
FINISHED WALL
(NON-COMBUSTIBLE)
Figure 36
COMBUSTIBLE SURROUND INSTALLATION
24”
TO TOP OF CHASE
JOINT BETWEEN FINISHED WALL AND
UNIT SEALED WITH 300° F 149
MATERIAL (SEALANT IS OPTIONAL)
° C
SEALANT
COMBUSTIBLE SURROUND
MANTELSHELF
2 X 4
HEADER
FINISHED WALL
(COMBUSTIBLE)
FINISHED WALL
(NON-COMBUSTIBLE)
FRONT RIM OR NON-COMBUSTIBLE
MATERIAL (INSTALLATION IS OPTIONAL)
Figure 37