background image

INSTALLATION PROCESS

A.

 Arch Frame Installation

1.  (Part No. 1* 1 unit + part No. 2 * 1 unit + 

part No. 3A* 2 unit) Please find the 1 piece 

of Male Bent Tubes (part No. 1), one piece 

of Female Bent Tubes (part No. 2) and 

2 pieces of Stake Peg for front wall (part 

No. 3A). Connect them to make one group 

arch.

2.  (Part No. 1* 1 unit + part No. 2 * 1 unit + 

part No. 4* 2 unit) Please find the 1 piece 

of Male Bent Tubes (part No. 1), one piece 

of Female Bent Tubes (part No. 2) and 2 

pieces of Stake Peg for middle arch frame 

(part No. 4). Connect them to make the 

second group arch. By turns, there are 6 

groups of arches.

1

2

3

1

2

3a

3a

10

11

15

15

18

19

4

7

6

11

5

9

Reviews: