background image

INSTALLATION PROCESS

B.

 Connect the Arch Frame

NOTE:  

Please check 

and reference the 

Frame Figure.

1.  Please connect the first and second group 

of arches by using Female Horizontal 

Connecting Tube (part No.6) and Bolt 

M8*80mm (part No.15), there are 5 pieces of 

female horizontal connecting tubes between 

them. Which make the front door group arch. 

(Please NOTE the direction of the bolt. DO 

NOT install the bolt on the top of the truss 

where the fabric will rest.)

2.  By turn, connect the other group arches 

by using Male Horizontal Connecting Tube 

(part No.5) and Bolt M8*80mm (part No.15) 

Please make the Horizontal Connecting 

Tube under the arch frame, the roof cover 

could be supported beautifully.

3.  Install the Diagonal Bracing Tube (part No.7) by using Bolt M8*50mm (part No.16) and Bolt 

M8*80mm (part No.15).

4.  Finally install all the Plastic Plug (part No. 18 and No. 19) in the suitable tubes.

Reviews: