background image

INSTALLATION PROCESS

D.

 Duckbill Nail Installation

4.  Finally adjust the frame and rope, 

make sure the cover is binding and 

smooth.

Insert the 12mm Steel Rod (part No.10) into one Duckbill Nail (part No.9) and use electric 

hammer to sink the nail into the earth deeply. Then fix it to the lower of frame tube using U 

bolts (part No.11). There are 6 duckbill nails.

NOTE:

DO NOT LEAVE THE ROOF COVER UNATTACHED UNDER ANY

CIRCUMSTANCES UNTIL THE FINAL ASSEMBLY AND TIGHTENING

HAS BEEN COMPLETED. THE PROCESS IS QUITE EASY, BUT SOME

TIGHTENING ADJUSTMENTS WILL BE NECESSARY TO PRODUCE A

FLAT, TENSIONED ROOF COVER. PLEASE ADJUST THE ROOF

COVER EVERY MONTH.

Reviews: