89
Professional mode
In case of dual-tank systems, the tank
to be charged first is defined: tank 1,
tank 2 or parallel charging.
›t pause‹ is used to set the pause
time between twot switch-ON tests.
›t charge‹ serves to define the
charging time for the secondary tank.
Once ›dT Coll‹ is reached,
the pause time is restarted.
Continue with ›Basic functions‹.
The following items appear under
›1.3. Basic functions‹ next to the
operation mode menus:
- ›Thermostat‹
- ›Output parameter‹
- ›Collector cooling‹
- ›Post Heating Requ. ...
... and enhanced menus regarding the
- ›Holiday function‹
- ›Delta T control‹
- ›Fixed T control‹
- ›Increase return T‹
Call up the menu item ›Thermostat‹.
Priority
Pause time
Charge time
dT Collector
Tank 1
2min
20min
2.0K
1.2.8 Priority charging
25.08.2012
10:34
Thermostat
Output parameter
Tube collector
Holiday function
Collector cooling
Commissioning
Delta T control
1.3 Basic functions
25.08.2012
10:35
Holiday function
Collector cooling
Commissioning
Delta T control
Fixed T control
Post Heating Request
Increase return T
1.3 Basic functions
25.08.2012
10:35
Summary of Contents for smart Sol plus
Page 1: ...Equipment Excellence ...
Page 7: ...7 Dimensions 218 mm 51 mm 109 mm dmax 5 9 mm 109 mm 140 mm 30 mm 48 mm 218 mm 5 mm ...
Page 56: ...56 ...
Page 113: ......