92
Professional mode
To receive correct measured values
from the tube collector system, the
pump must be switched ON briefly.
By activation of the function, the
solar circuit pump can be started
time- and/or temperature-controlled.
The time sequence,
the pump ON time and ...
...to define the required control
algorithm as ›dT‹ or ›Fixed T‹.
In case of plants with long piping or
slow response, overtravel times for
the solar circuit, pump and valve can
be determined.
Continue to menu item
›Tube collector‹.
... the pump delivery rate as a
percentage value can be entered.
The two time programs are
performed one after the other.
Continue via the menu item
›Holiday function‹.
Algorithm, output control
Overtravel time
min. pump speed
max. pump speed
dT
0s
50%
100%
1.3.7 Output parameter
25.08.2012
10:35
Activation
Start
t-ON restart
T-ON restart
t solar 1
n solar 1
t solar 2
time-dependent
10min
20.0°C
20s
100%
0s
1.3.2 Tube collector
25.08.2012
10:35
T-ON restart
t solar 1
n solar 1
t solar 2
n solar 2
Start time
End time
20.0°C
20s
100%
0s
30%
06:00
20:00
1.3.2 Tube collector
25.08.2012
10:35
Summary of Contents for smart Sol plus
Page 1: ...Equipment Excellence ...
Page 7: ...7 Dimensions 218 mm 51 mm 109 mm dmax 5 9 mm 109 mm 140 mm 30 mm 48 mm 218 mm 5 mm ...
Page 56: ...56 ...
Page 113: ......