WIND TECHNOLOGY
+34 96 556 00 18 info@enair.es
Avenida de Ibi 44
–
P.O. 182-03420 | Castalla (Alicante), España
www.enair.es
P a g e
|
18
The w ind turbine assembly is divided int o f ive simple st eps. These steps should be
f ollow ed in the order show n below .
Step 1: Electrical connections
Step 2: Placement on the tower
Screws:
Hexagonal screw bonding t oe: DIN 933 M-14x55 INOX A2
8
Pressure w asher screw M14 bonding.: DIN 127 zinc plat ed
8
Washers screw union: DIN 125 M14 zinc plat ed
16
Binding screw nut : DIN 934 M14 INOX A2
8
Tools:
22 spanner, hexagonal of 22 and t orque w rench
Tightening torque:
127 Nm oder 93.5 Lbf .f t
4.2 Installing the machine
Join the t hree elect rical connectors f rom the brushes
w it h the cables installed in t he t ow er.
To prevent t hat t he w eight of t he connected cables pulls
on the brushes, t hey should be w inded three t imes
around a prepared w elded part at t he top of t he tow er.
Summary of Contents for E30 PRO
Page 41: ......