122
Rev B 2022/03
CyBio Well vario
A 1.5.2Tubing
Reservoir filling station
The pump for reservoir filling is located at the stacker. The pump's direction of rotation
determines the direction in which liquid will be transported (
Fig. 127: Direction of rotation and delivery of liquid
for peristaltic pump at the stacker
"Fill" command: The rollers of the peristaltic pump rotate clockwise. This means that liquid
is pumped from the left to the right. The left tube end must be submerged in the reagent
vessel while the right tube end connects to the reservoir.
A 1.5.3Insertion of Tube into Peristaltic Pump
1.
Switch peristaltic pump lever to the left
Pump is open.
2.
Insert tube in same direction as shown in
.
3.
Return lever of peristaltic pump into rightmost position.
4.
Push right and left tube locks into locked position.
Pump is closed and ready for operation.
Fig. 128: Insertion of tube into peristaltic pump
CAUTION
There is danger of crushing or pinching while the pump is in action.
Terminate all currently running system programs or switch system power off before you
begin work at a peristaltic pump.
Summary of Contents for Analytik Jena CyBio Well vario
Page 1: ...User Manual CyBio Well vario ...
Page 3: ...Rev B 2022 03 III CyBio Well vario ...
Page 5: ...Rev B 2022 03 V CyBio Well vario ...
Page 6: ...VI Rev B 2022 03 CyBio Well vario ...
Page 7: ...Rev B 2022 03 VII CyBio Well vario ...
Page 8: ...VIII Rev B 2022 03 CyBio Well vario ...
Page 12: ...XII Rev B 2022 03 CyBio Well vario ...
Page 16: ...XVI Rev B 2022 03 CyBio Well vario ...
Page 26: ...10 Rev B 2022 03 Technical Specifications CyBio Well vario ...
Page 62: ...46 Rev B 2022 03 Technical Description CyBio Well vario ...
Page 118: ...102 Rev B 2022 03 Troubleshooting CyBio Well vario ...
Page 126: ...110 Rev B 2022 03 Decommissioning CyBio Well vario ...
Page 130: ...114 Rev B 2022 03 Accessories Spare Parts CyBio Well vario ...
Page 132: ...116 Rev B 2022 03 Waste Disposal CyBio Well vario ...
Page 142: ...126 Rev B 2022 03 CyBio Well vario ...