HS 55 (Batch Mode)
Installation and commissioning
29
}
Open the red hood of the Hg/hydride system.
}
Pull the short-circuit plug in the Hg/hydride system up and remove it.
}
Insert the module. To do so, align the module with the guide pins and
push it down until the plug-in connection has been established.
}
Secure the module with the knurled head screws.
}
Make the hose connections to the Hg/hydride system via the frame:
– Attach the hose with the red hollow screws to the rear connection
with the red arrow (1).
– Attach the hose with the green hollow screws to the middle connec-
tion with the green arrow (2).
– Attach the hose with the black hollow screws to the front connection
with the black arrow (3).
}
Close the red hood.
}
Connect the system to the power line, the AAS device and the cell unit.
}
Switch on the devices: first the Hg/hydride system, then the AAS.
}
After the devices have been initialized in the HS Wizard program, click
the
[Next]
button. Exit the program.
Functional test
}
Start the ASpect LS or ASpect CS program.
}
In the Quick Start window, select the Hydride method and initialize the device config-
uration.
}
Close the window with OK.
}
Click the Hydride system button.
}
Check the heating function. Open the red device hood.
}
In the Hydride system window, select the Heating on option under Collector on the
Control tab.
}
Check whether the heating coil lights up.
}
Check the cooling. Select the Cooling on option.
}
Check whether a vertical air flow can be felt.
}
End the functional test. Select the off option. Close the red hood.