Installation and commissioning
HS 55 (Batch Mode)
26
Figure 14Hose routing for the "Hydride"/"Hg without enrichment" mode
"Hg with enrichment" mode
}
Select the drying hose type "Hg".
}
Connect the drying hose to the gas connection marked "to cell" on the batch module
via the connection hose.
}
Screw the other end of the hose to the connection marked "to enr." (to enrichment)
on the front plate.
}
Attach the cell hose to the connection marked "enr. to cell" on the front plate.
}
If not already done: attach the cell hose to the middle connection of the cell.
Figure 15Hose routing for the "Hg with enrichment" mode
Reduction agent transport
}
Fill the storage bottle with the reduction agent.
}
Connect the reduction agent intake hose (with the blue hollow screw) to the pump
hose of the 1-channel pump and immerse it into the storage bottle for the reduction
agent up to the stopper.
}
Hook the hose cartridge into the Hg/hydride system. Set the locking levers so that
the solution is transported evenly.
ü
The Hg/hydride system is now installed on the AAS device and ready for mea-
surements.
Activation sequence
The AAS device supplies the operating voltages of +5 V/+24 V to the functional module.
Line voltage is only present at the basic module. During the activation initialization, the
functional module checks the line frequency. If no voltage is present at the basic module,
the functional module cancels the initialization.
This leads to the following activation sequence: