Commissioning
ASP Station 2000 RPS20B
28
Hauser
8
Commissioning
8.1
Function check
L
WARNING
Incorrect connection, incorrect supply voltage
Safety risks for staff and device malfunctions!
‣
Check that all connections have been established correctly in accordance with the wiring
diagram.
‣
Ensure that the supply voltage matches the voltage indicated on the nameplate.
8.2
Switching on
1. Switch on the supply voltage.
The display starts to light up and displays the message "UNIT OFF".
2. Press the operating key below the "ON" field.
The message "UNIT ON" appears. The device is in operation and you can perform the
Quick Setup.